Proposal & plan for a waterboard headquarters, measurements variable, 2002.
the proposal was for slow-motion projections (‘moving architecture’)
in the public reception areas,
and four-story, (b/w) vertical photo-constructions, for bright-colored service
shafts rising through the firm’s (private) work-space.
The plan was not realised, but elements can, in future, be ‘translated’ for a suitable, alternate space.